
A New Way
Power Kerbs is challenging the status quo. The old ways of installing charging infrastructure in the street scene must change to meet 2030 targets.
Reducing Risk
Power distribution is the biggest challenge for any charge point installer. Power Kerbs range of products allows for 5 charge points to be installed without trenching the footpath
Systematic Project Management
Power Kerbs can help with end to end installation. From initial concept, to location validation, electrical designs, approvals and construction management, Power Kerbs is here to help.

Underestimated Risk
The risk is always in the ground. A seemingly innocent looking footpath can easily give your construction program a huge set back in terms of time, cost and public image.
Getting charge points in the footpath without disturbing existing services is the challenge set, and Power Kerbs has over come this challenge with our patent pending product. Enquire today.
Net Zero 2030
It will not happen on its own. Without a fundamental shift to a new way of doing things there will be a massive shortage of Charge Point Infrastructure by 2030. The needle has to shift. Therefore more charge points installed in an innovative and less risky fashion will help achieve Net Zero targets.


Let’s talk about your next EV charge points project
If you are looking to save time, money and risk on your next EV installation, please get in touch.